What ice and water shield is
Regular underlayment (felt or synthetic) is nailed down and sheds water that runs over it. Ice and water shield is different in two ways:
- It sticks to the roof deck. A peel-off backing exposes an adhesive layer, so water can't run underneath it.
- It seals around nails. The rubberized asphalt closes up around each shingle nail that goes through it.
That matters where water can sit or back up instead of running off: at the eaves when ice dams form, in valleys where two roof planes pour water together, and at walls and chimneys where flashing meets the roof. In the trade it's also called an ice barrier, leak barrier or self-adhered membrane. "Ice & Water Shield" started as the name of a Grace product that became the generic term. Grace's maker, GCP Applied Technologies, was bought by Saint-Gobain in 2022, and the product is now sold by CertainTeed under the Vycor name. Other brands sell the same type of product under their own names.
Why ice dams make it necessary
In cold climates, heat escaping from the house melts snow on the upper roof. The meltwater runs down and refreezes at the cold overhang, building a ridge of ice. More meltwater pools behind that ice dam and backs up under the shingles. Shingles shed water running downhill, but they can't hold back standing water. Ice and water shield is the layer that keeps that water out of the house.
It doesn't prevent ice dams. Air sealing, insulation and attic ventilation do that. It's the backup for when they form anyway.
Where it goes on a shingle roof
The eave rule is a code requirement in ice-dam areas. For valleys, the building code requires a lining. For closed valleys (shingles run across the valley), that means smooth roll roofing at least 36 in wide, and a self-adhering membrane is an allowed alternative. Most roofers use the membrane. Chimneys, walls and low-slope sections are common practice or come from the shingle manufacturer's instructions, which can be a condition of the warranty.
When code requires it
Under the International Residential Code (IRC), which most US states adopt with local changes, an ice barrier is required at the eaves where there's a history of ice forming along the eaves and causing water backup. Your local jurisdiction says whether that's you, in its climate design table.
- Where: from the lowest edge of every roof surface to a point at least 24 in inside the exterior wall line of the building (IRC R905.1.2).
- Steep roofs: the 2018 IRC also requires the barrier to reach at least 36 in measured along the slope from the eave on roofs of 8/12 and steeper. Sources disagree on whether the 2024 edition kept this sentence, so check the edition your area has adopted. The calculator applies it anyway, to be safe.
- Material: a self-adhering polymer-modified bitumen sheet, or at least two layers of underlayment cemented together.
- Exception: detached accessory structures that don't contain conditioned (heated or cooled) floor area.
States and towns adopt different editions and often amend them. Some require more than 24 in.
The quickest way to know for sure: call your local building department and ask, "Is an ice barrier required at the eaves here, and how far up?" Many cold-climate areas require more than the 24 in minimum.
Ice and water shield calculator
Enter your eaves, valleys and any other areas. The calculator works out how many rows you need at the eaves to reach the required distance inside the wall, then converts everything to rolls. Get eave length and pitch from the roof square footage calculator if you haven't measured yet.
How the calculator works
distance up the slope = (overhang + distance inside wall) × pitch multiplier
rows = 1 + ⌈(distance − roll width) ÷ (roll width − lap)⌉
rolls = ⌈((rows × eave + valleys + rakes) ÷ roll length + other areas ÷ roll area) × (1 + waste)⌉
Example: 80 ft of eaves at 6/12 with a 12 in overhang. Reaching 24 in inside the wall means covering 36 in horizontally, which is 36 × 1.118 = 40.2 in up the slope. One 36 in row isn't enough, so you need 2 rows, or 160 ft of membrane. With 75 ft rolls, that's 160 ÷ 75 = 2.13 rolls, or 2.35 with 10% waste: 3 rolls.
Notice that a wider overhang or a steeper pitch can push you from 1 row to 2. That's why "one row at the eaves" isn't always enough to meet code.
Installation tips
- Order with drip edge: at the eaves, the drip edge usually goes on first and the membrane laps over it. At the rakes it's usually the other way round. Follow the manufacturer's instructions for your products.
- Mind the temperature: the adhesive needs warmth to bond. For example, GAF says to apply its StormGuard and WeatherWatch membranes on a dry deck when the air is between 40°F and 120°F. Other brands set their own limits.
- Lap it right: each row overlaps the one below. Grace's data sheet calls for a 3.5 in side lap, and GAF's WeatherWatch instructions call for 6 in end laps where two rolls meet.
- Don't leave it exposed: membranes can only sit uncovered for a limited time. Check the data sheet and get the shingles on promptly.
- Ventilation still matters: covering the whole roof with a vapor-impermeable membrane can trap moisture in some attics. Ask a pro before going wall-to-wall.
Sources: Grace Ice & Water Shield product data sheet; GAF technical bulletin R-152 (cool weather installation); GAF WeatherWatch installation instructions; 2018 IRC R905.1.2 as published by Pennsylvania code officials. States and towns adopt different code editions and amendments, so confirm the rules with your local building department before you install.
Common questions
Is ice and water shield the same as underlayment?
It's a type of underlayment, but a specialized one. It's self-adhering and seals around nails. Regular felt or synthetic underlayment covers the rest of the roof. The shingle calculator estimates that separately.
Should I put ice and water shield on the whole roof?
Usually not on a normal-pitch roof. It costs more than regular underlayment and can trap moisture in some attics. Full coverage is more common on low-slope sections. Ask your roofer or the manufacturer.
Do I need it in a warm climate?
The eave requirement only applies where ice damming is a known problem, so many warm areas don't require it. It's still widely used in valleys and around penetrations, and some manufacturers require it for certain warranties. Check with your local building department.
Complete your shingle order
Add bundles, starter strip, ridge cap, regular underlayment and drip edge in the shingle calculator.
Open the shingle calculator →
Related calculators
Shingle calculator
Bundles, squares, starter and ridge cap.
Calculate →
Roof square footage calculator
Roof area, squares and eave lengths.
Calculate area →